runtime table shown in planner
Robert C. Helling
helling at atdotde.de
Tue Feb 19 13:04:18 PST 2013
On Feb 19, 2013, at 10:01 PM, Robert C. Helling wrote:
> Try setting the gas to 10/70 and the GF's to 30/95 then plan 4min to 110m and +16m at 110. This gives a plan that almost constantly violates the ceiling.
Let me add that it's essential to use Trimix to see this, with air there seems to be no problem.
Robert
--
.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oO
Robert C. Helling Elite Master Course Theoretical and Mathematical Physics
Scientific Coordinator
Ludwig Maximilians Universitaet Muenchen, Dept. Physik
print "Just another Phone: +49 89 2180-4523 Theresienstr. 39, rm. B339
stupid .sig\n"; http://www.atdotde.de
More information about the subsurface
mailing list