Testing of planner against other software

Dirk Hohndel dirk at hohndel.org
Tue Jun 24 06:06:06 PDT 2014


Guys, stop calling Subsurface "SS".
If you don't understand why I, German by birth, am very upset by that, try opening a history book (or use Google) and find out what this acronym means to a lot of people.

I will kick people of this list who cannot manage to respect this request.

Seriously.

/D
---
From my phone

Davide DB <dbdavide at gmail.com> wrote:

>Ok thank you for the explanation.
>Hence SS run times seems to be slightly longer with the same GF for
>more aggressive dives.
>
>If I do not take in account SS and DP extra time from 6m > 0m (SS=6'
>DP=1'), I get the following runtimes:
>
>30 at 45m; 50%
>
>DP = 63'
>SS = 60'
>
>40 at 45m; 50%
>
>DP = 88'
>SS = 88'
>
>40 at 45m; 50% + 100%
>
>DP = 78'
>SS = 78'
>
>50 at 45m; 50% + 100%
>
>DP = 103'
>SS = 102'
>
>30 at 70m; 50% + 100%
>
>DP = 131'
>SS = 143'
>
>40 at 70m; 50% + 100%
>
>DP = 189'
>SS = 208'
>
>30 at 90m; 35/25 + 50% + 100%
>
>DP = 191'
>SS = 217'
>
>
>PS
>Do you confirm that break gas check box doesn't work?
>
>Bye
>
>
>2014-06-24 14:22 GMT+02:00 Robert Helling <helling at atdotde.de>:
>>
>> On 24.06.2014, at 12:51, Davide DB <dbdavide at gmail.com> wrote:
>>
>> Davide,
>>
>> So you mean that 5 minutes are all the deep stops summed together?
>>
>>
>> I mean the ascent to the first stop. Let’s take for concreteness the 30min @
>> 70m with EAN50 and O2. For example it takes 3:42 to get from 70m to 42m.
>> Then the actual stop is 2min (stops are always multiples of full minutes).
>> And the display that you show always rounds to full minutes. To see more
>> details, turn on “display transitions in deco” or even “verbatim dive plan”
>> which gives you
>>
>> Subsurface dive plan
>> based on GFlow = 20 and GFhigh = 85
>>
>> Transition to 70 m in 3:00 min - runtime 3:00 on (15/55)
>> Stay at 70 m for 27:00 min - runtime 30:00 on (15/55)
>> Transition to 42 m in 3:42 min - runtime 33:42 on (15/55)
>> Stay at 42 m for 2:00 min - runtime 35:42 on (15/55)
>> Transition to 39 m in 0:30 min - runtime 36:12 on (15/55)
>> Stay at 39 m for 2:00 min - runtime 38:12 on (15/55)
>> Transition to 36 m in 0:30 min - runtime 38:42 on (15/55)
>> Stay at 36 m for 2:00 min - runtime 40:42 on (15/55)
>> Transition to 33 m in 0:30 min - runtime 41:12 on (15/55)
>> Stay at 33 m for 3:00 min - runtime 44:12 on (15/55)
>> Transition to 30 m in 0:30 min - runtime 44:42 on (15/55)
>> Stay at 30 m for 4:00 min - runtime 48:42 on (15/55)
>> Transition to 27 m in 0:30 min - runtime 49:12 on (15/55)
>> Stay at 27 m for 6:00 min - runtime 55:12 on (15/55)
>> Transition to 24 m in 0:30 min - runtime 55:42 on (15/55)
>> Stay at 24 m for 4:00 min - runtime 59:42 on (15/55)
>> Transition to 22 m in 0:21 min - runtime 60:03 on (15/55)
>> Switch gas to EAN50
>> Stay at 22 m for 1:00 min - runtime 61:03 on EAN50
>> Transition to 21 m in 0:12 min - runtime 61:15 on EAN50
>> Stay at 21 m for 3:00 min - runtime 64:15 on EAN50
>> Transition to 18,0 m in 0:30 min - runtime 64:45 on EAN50
>> Stay at 18,0 m for 4:00 min - runtime 68:45 on EAN50
>> Transition to 15,0 m in 0:30 min - runtime 69:15 on EAN50
>> Stay at 15,0 m for 6:00 min - runtime 75:15 on EAN50
>> Transition to 12,0 m in 0:30 min - runtime 75:45 on EAN50
>> Stay at 12,0 m for 8:00 min - runtime 83:45 on EAN50
>> Transition to 9,0 m in 0:30 min - runtime 84:15 on EAN50
>> Stay at 9,0 m for 14:00 min - runtime 98:15 on EAN50
>> Transition to 6,0 m in 0:30 min - runtime 98:45 on EAN50
>> Switch gas to EAN100
>> Stay at 6,0 m for 41:03 min - runtime 139:48 on EAN100
>> Transition to 0,0 m in 6:15 min - runtime 146:03 on EAN100
>>
>> Gas consumption:
>> 6822ℓ of (15/55) — Warning: this is more gas than available in the specified
>> cylinder!
>> 1517ℓ of EAN50
>> 1253ℓ of EAN100
>>
>> Best
>> Robert
>>
>>
>>
>> --
>> .oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oOo.oO
>> Robert C. Helling     Elite Master Course Theoretical and Mathematical
>> Physics
>>                       Scientific Coordinator
>>                       Ludwig Maximilians Universitaet Muenchen, Dept. Physik
>>                       Phone: +49 89 2180-4523  Theresienstr. 39, rm. B339
>>                       http://www.atdotde.de
>>
>> Enhance your privacy, use cryptography! My PGP keys have fingerprints
>> A9D1 A01D 13A5 31FA 6515  BB44 0820 367C 36BC 0C1D    and
>> DCED 37B6 251C 7861 270D  5613 95C7 9D32 9A8D 9B8F
>>
>>
>>
>>
>
>
>
>-- 
>Davide
>_______________________________________________
>subsurface mailing list
>subsurface at hohndel.org
>http://lists.hohndel.org/cgi-bin/mailman/listinfo/subsurface


More information about the subsurface mailing list