[Patch] Show duration before runtime on planner notes table

Rick Walsh rickmwalsh at gmail.com
Tue Jun 16 04:25:26 PDT 2015


Switch the column order of the planner notes table so that duration is
displayed before runtime.  This is consistent with:
- the verbatim output order, e.g. "Stay at 12.0 m for 3:00 min - runtime
32:48 on EAN50"
- MultiDeco, e.g. http://www.hhssoftware.com/multideco/view_multideco.html
- Planner on the Shearwater Petrel
- How I have been taught to write out my dive plan in my wetnotes

R
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20150616/2942745a/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 0003-Show-duration-before-runtime-on-planner-notes-table.patch
Type: text/x-patch
Size: 3222 bytes
Desc: not available
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20150616/2942745a/attachment.bin>


More information about the subsurface mailing list