Provide planner option to switch gas only when a stop is required

Rick Walsh rickmwalsh at gmail.com
Mon Jun 22 07:26:06 PDT 2015


These patches add the planner option to postpone a gas switch to the next
required stop.  I haven't managed to make it do silly things, but please do
check when you get a chance - no rush apply.

The option is ignored when the current gas is hypoxic.

It's interesting to see what effect delaying the gas switch has until the
next stop has on the calculated profile.  It doesn't make much difference.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20150623/77a61db0/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 0002-Implement-planner-option-to-switch-only-at-required-.patch
Type: text/x-patch
Size: 4478 bytes
Desc: not available
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20150623/77a61db0/attachment-0002.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 0001-Add-only-switch-at-required-stop-option.patch
Type: text/x-patch
Size: 6615 bytes
Desc: not available
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20150623/77a61db0/attachment-0003.bin>


More information about the subsurface mailing list