Allow replanning of logged dives

Davide DB dbdavide at gmail.com
Mon Oct 12 02:23:48 PDT 2015


On Mon, Oct 12, 2015 at 9:59 AM, Anton Lundin <glance at acc.umu.se> wrote:
>
> If you're on a really bad deco gas, ie a fat bottom gas, and have a huge
> deco the TTS at that point will be enormous.

I'm not on a bad deco gas :)

> One idea would be to cap the TTS calculations in such a point to say,
> its 100min+ or something, to have it terminate in resonable time.
>

I copy my original question:

> I plan and calculate deco on the fly via ratio deco. I'm noticing that
> my profiles are always compliant with Bulhmann 20/85 except (maybe)
> for the end of the dive. Of course the profile ends when I surface and
> It's really a shame being able to analyze the entire profile but
> missing the last part info. From what I see I always respect the 20/85
> GF constraints but probably I "cut" the last oxygen part. I don't know
> if I missed 30 minute at 6 meters or just five minutes. I was
> wondering if there is a quick smart way to understand how much deco,
> eventually, I omitted in a real profile.
> Robert told me that the easiest way to answer my question is just
> enabling to copy the dive in the planner module.

Robert implemented this feature copying a real profile to the planner
(my kudos to him). Actually it's not very intuitive and easy to use.
I was just asking to know how much deco I missed, e.g. what my TTS was
when I decided to quit?

Actually this feature already exist (Show/NDL/TTS) but I was not able
to see it working with my typical profiles:
three deco gases/ 2h-3h runtime. See the attachment.


-- 
Davide
https://vimeo.com/bocio/videos
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Ratio deco versus GF-20-85.PNG
Type: image/png
Size: 178645 bytes
Desc: not available
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20151012/503f261d/attachment-0001.png>


More information about the subsurface mailing list