lots of activity

Dirk Hohndel dirk at hohndel.org
Sat Nov 25 16:13:28 PST 2017


For those not subscribed to the changes on GitHub, a lot is going on. Berthold, Lubomir, Jan, and Stefan are all on a role. 72 commits from the four of them in two weeks.
In the meantime Anton and I reworked our Travis CI support. We now have continuous builds of all of our platforms for every PR as well as every merge / push. Including Android and Mac (both of those are unsigned which makes them slightly harder to use). And after a little glitch a few days ago those builds are now correctly checked for success again.
Many UI issues are being addressed, the planner is improving quite a bit (Robert is just about to merge another dozen or so commits on that). It's really fun to watch.

I am pushing towards a 2.0.1 release of Subsurface-mobile for Android and would love testing of what I pushed to the Beta Channel on Google Play.
And once Robert's changes are in I'd also like to move towards a 4.7.5 in a week or so.

New strings have been pushed to Transifex - but I'm assuming those aren't the final set before those two releases. Still, doing translations whenever I push things might make the process overall easier :-)

Thanks to everyone who is contributing so enthusiastically right now. This is FUN.

/D


More information about the subsurface mailing list