Planner. Strange behavior while changing deco mixes.

Dirk Hohndel dirk at hohndel.org
Wed Feb 20 12:26:22 PST 2013


Salvador Cuñat <salvador.cunat at gmail.com> writes:

> Hi.
>
> I was just testing the recent patches to the planner and realized that
> when changing deco mixes (EAN 50 - 21 m  and  O2 - 6m) the calculated
> plan diverges widely from the calculated ceiling.
> While at the 21 m stop the profile shows an EAD of 21m, when it must be
> 13,29 m  (if I'm not wrong), and an strangely long duration, then jumps
> to a very brief 15m stop, without 18m.
> Something very similar on the 6m stop except for the EAD which is a
> correct  0m in this case, and don't loose the 3m stop.

Can you file a bug on trac so we don't forget to look at this?
I won't try to address this prior to the release

/D