Fwd: Re: Quirks of Subsurface planner
Willem Ferguson
willemferguson at zoology.up.ac.za
Mon Jan 23 09:59:16 PST 2017
On 23/01/2017 18:50, Robert Helling wrote:
> Willem,
>
> The change to the wrong gas that you initially reported I cannot
> reproduce and thus not work on. Can you reproduce that? What steps do
> I have to follow?
>
> Best
> Robert
1) Open the dive plan file for Thu Jan 19th in the XML file I sent.
2) Delete the points at the end of the dive, those shallower than 16m.
This is the part of the dive that would in this case be planned by the
planner.
3) At around 97 minutes there is a short erroneous segment that uses
trimix 25/15.
depth
duration
runtime
gas
➘
15m
1min
1min
(25/15)
➙
15m
4min
5min
➘
26m
1min
6min
➙
26m
3min
9min
➘
35m
1min
10min
➙
35m
2min
12min
➘
45m
1min
13min
➙
45m
20min
33min
➚
35m
1min
34min
➙
35m
20min
54min
(31/6)
➚
26m
1min
55min
➙
26m
20min
75min
EAN36
➚
16m
1min
76min
➙
16m
20min
96min
EAN50
➚
15m
1min
97min
(25/15)
➚
6m
1min
98min
-
6m
5min
103min
oxygen
➚
3m
1min
104min
-
3m
16min
119min
➚
0m
1min
120min
Anyway, that is what I experience on my Ubuntu machine with Subsurface
4.6.0. version g22fc18
Hope this helps?
Kind regards,
willem
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.subsurface-divelog.org/pipermail/subsurface/attachments/20170123/6d78d505/attachment.html>
More information about the subsurface
mailing list